Audley Texas Printer Site Survey Hub and Pre-Installation Checklists

Audley Printer Site Surveys

Confirm Your Site Is Ready Before Install

Download the correct Audley printer site survey and pre-installation checklist before delivery. Each document identifies the equipment-specific information the customer must review, including delivery and uncrating, electrical service, operating environment, computer preparation, startup supplies, and the signed site-readiness acknowledgment required for installation planning.

Use Both Resources Before Installation

Start with the machine-specific site survey on this page, then review the Audley Installation Requirements Center for the related preparation guide. Confirm that the selected survey matches the exact printer and accessory configuration listed on your order.

Open Installation Requirements

Audley Site Survey Documents

Select the document that matches your Audley printer model. Review every page, complete the requested business and installation-site information, verify the listed requirements, and return the signed form through the process provided by your Audley representative.

UV DTF Printer

Audley 8030-3 13-Inch 3-Head UV DTF

Site survey and pre-installation checklist for the Audley 8030-3 UV DTF printer. The document covers equipment specifications, delivery and uncrating, site power, environmental conditions, computer preparation, startup consumables, and customer acknowledgment.

13-Inch Working Width 3-Head UV DTF PDF Checklist
Open Site Survey PDF
UV DTF Printer

Audley 8073-3 24-Inch 3-Head UV DTF

Site survey and pre-installation checklist for the Audley 8073-3 UV DTF printer. The document identifies the printer configuration and required planning for unloading, electrical service, environment, computer setup, supplies, and installation readiness.

24-Inch Working Width 3-Head UV DTF PDF Checklist
Open Site Survey PDF
DTF Printer System

Audley 8076-3 24-Inch 6-Head DTF With ADL07K10 Shaker

Site survey for the Audley 8076-3 DTF printer and ADL07K10 powder shaker system. It addresses the two-crate delivery, system configuration, unloading requirements, power planning, environmental conditions, computer readiness, startup supplies, and acceptance requirements.

24-Inch DTF 6 Print Heads ADL07K10 Shaker
Open Site Survey PDF
DTF Printer System

Audley S8074-3 24-Inch 4-Head DTF With ADL07K10 Shaker

Site survey for the Audley S8074-3 DTF printer and ADL07K10 powder shaker. The checklist documents the machine configuration, two-crate unloading plan, site utilities, environmental limits, computer and software preparation, supplies, and the customer installation-readiness agreement.

24-Inch DTF 4 Print Heads ADL07K10 Shaker
Open Site Survey PDF
DTF Printer System

Audley S7070-3 24-Inch 2-Head DTF With ADL07K12 Shaker

Site survey for the Audley S7070-3 DTF printer and ADL07K12 powder shaker. Use it to confirm delivery access, unloading, equipment placement, electrical service, operating environment, production computer, required supplies, and the signed pre-installation acknowledgment.

24-Inch DTF 2 Print Heads ADL07K12 Shaker
Open Site Survey PDF
UV Flatbed Printer

Audley 9060 Flexible UV Flatbed

Site survey and pre-installation checklist for the Audley 9060 UV flatbed in the flexible configuration with vision-camera positioning. The document covers shipping and unloading, machine footprint, dedicated power, environmental limits, computer preparation, and installation acceptance.

9060 Flexible Vision Camera UV Flatbed
Open Site Survey PDF
UV Flatbed / Cylinder Printer

Audley A3Pro UV Printer

Site survey and pre-installation checklist for the Audley A3Pro flatbed and cylinder UV printer. It provides delivery and unloading guidance, shipping and machine dimensions, site power and environment requirements, computer preparation, consumables, and customer acknowledgment.

A3Pro Flatbed / Cylinder UV Printer
Open Site Survey PDF

Complete the Site Survey Before Delivery

The site survey is a machine-specific planning and acknowledgment document. Use the exact form for the purchased equipment, confirm all listed requirements with the responsible parties at the installation location, and provide the completed form through the process established by your Audley sales or service contact. Electrical work must be completed by a qualified electrician where required. Audley installation technicians do not perform building electrical work.

Step 1 Match the PDF to the exact printer and shaker or accessory configuration on the order.
Step 2 Review delivery access, unloading equipment, crate information, and the final machine location.
Step 3 Verify power, environment, computer, software, networking, supplies, and operator readiness.
Step 4 Complete and return the signed site survey before the scheduled installation or delivery milestone.